Building Portfolio

C.V. 2010-2017

          • Howard S Wright, 11/2017-12/2017 (Portland Building: Demo, framing)
          • LJPearson, late summer 2017  (Front Street Office: exterior finish, accessories)
          • Bremik-MB Structures, summer 2017 (Lents, Multnoma Villages Multi-unit residentials: framing, weatherization, siding, window install)
          • Art Cortez, May 2017 (Loyd Center: Steel Studs, drywall)
          • Anderson 4-2017 (Hilton: Accessories, framing)
          • Right To Dream Too 4/2017-  7/2017 ( Rest Shelter Build: P.M., Design Build, Estimates, Fund Raising, Volunteer Recruitment, Superintendent and Crew Lead for Deck, Tent build and Tiny Home relocation)
          • Ming-Hoffman 9/2016-3/2017 (Airport, Washington Park Reservoir, OHSU: Surveying, layout)
          • In Store Services, 1/07/2016-1/23/2016 (Whole Foods: Tenant Improvement)
          • Marathon Construction 10/2015-12/2015 (Construction Coordinator)
          • Cascade Bridge 9/21/2015-10/04/2015(Overpass and onramp )
          • Howard S Wright, 11/2017-12/2017 (Portland Building: Demo, framing)
          • NorthWest Steeplejacks, 8/10/2015-9/23/2015 (Residentials and Temple: Addition, Remodel and TI)
          • Square Deal Remodeling, 6/19/2015-6/26/2015(Residential: Cabinets and Trim)
          • BC Installation, 2/1/2015-2/11/2015 (PNCA: Doors and Hardware)
          • Stacy Witbeck, 7/28/2014- 12/2014 (Ruby Junction: General and Concrete Carpentry)
          • Jaeger & Erwert General contractors, 7/16/2014-7/25/2014, (Sunset High School, roofing framing)
          • Art Cortez,7/18/2015-7/31/2015 (Sandy&Cully, Convenience Store on 82nd)
          • Mattson Siding 5/29/2016-6/10/2016)
          • ATG 4/25/2016-5/22/2016 (Infomart: Steel Studs, Cuble assembly)
          • North Woods Electric, 5/2015- (Single Family and Multi-Unit Residential : Lake Oswego and Gresham)
          • Hoffman, 3/3/14-3/20/2014 (Kelly Butte: Integrated Concrete slabs)
          • SDB, 1/13/2014-2/2/2014 (Intel: clean room stocker assembly)
          • Walsh/RDF,  4/10/2013-6/28/2013 (Eliot, Four Square: window prep, trim install)
          • Stacy and Witbeck/Mowatt, Marion, Stacey and Witbeck, 6/4/2012-12/22/2012  (all three on TriMet Light Rail: bridgework, wall crews, structures)
          • Pence Kelly, 3 W (4/25/12-5/11/12) –  (Oregon College of Oriental Medicine, punch list)
          • Walsh/RDF, 5 W (3/1/2012-4/13/2012) –  (Multi-unit Residentials – Hatfield.: window install, Block 49: window prep)
          • BC Installation, 3 W – (1/23/2011-2/11/12) – (Gresham Courthouse, Sandy High School: Doors and Hardware)
          • Howard S. Wright, 6 M – (5/16/2011-10/6/2011) – (Edith Green Fed. Bldg. Highrise: form building, shoring, safety rail)
          • Wood Mechanix 2 M – (3/28/2011-5/12/11) –  (PCC Newberg, Envelope/Framing)
          • Interstate Roofing, 5 W – (2/18/11-3/24/2011) – (Camas High School, Portland Water Treatment Plant, Luxury Auto,  Flat Roofs)
          • Team Construction, 5 M – (8/7/201-12/24/2010) – (Rosewood, McCallister, Manor Care, Multi Unit Residential)